
Corner Store in Taipei
Status
Finished
Date Started
9/18/24
Date finished
N/A
Type
2-Point Perspective Drawing
Material(s)
Paper & Graphite Pencil
Size
9"x12"

Project History


October 2-3, 2024
On October 2nd & 3rd, I added finishing touches onto the drawing, including fixing some perspective lines in the interior sections, gave width to the sidewalk, and finished darkening the lines with pencil.
September 26-30, 2024
From September 26th - 30th, I revised the background and road, added windows to the foreground building, and began going over the foreground image in darker pencil.



September 23-24, 2024
Added further detail on main building details and made sketch background. Added Chinese calligraphy on sign. Also sketched out road and added small details.



September 18, 2024
Essentially the beginning of the project. Sketched out the foreground building and sidewalk, as well as rough interior.